5/27/21
APOLLO HIGH SCHOOL PHASE 4 Addition and Renovations
MACO-Evansville Blue
2280 Tamarack Road, Owensboro, KY., 42301.
The Work consists of an addition to and renovations of Apollo High School in multiple phases
Bidding Closed
5/11/21
South Heights Elem. Renov. - Download
RBS Design Group
replacement of the existing HVAC system and controls, ceiling tile and grid; a new sprinkler system
Bidding Closed
2/23/21
Ohio Co. Schools, AREA TECHNOLOGY CTR, ADDITION AND RENO. - Download
RBS Design Group
1406 South Main Street Hartford,KY 42347
Bidding Closed
2/16/21
Cravens Elem. Addition & Renovation - Download
MACO-Evansville Blue
owensboro, Kentucky
Addition And Renovation
Bidding Closed
1/12/21
DAVIESS CO. MIDDLE SCHOOL INFRASTRUCTURE PROJECT - Download
RBS Design Group
Provide utilities as indicated for proposed new middle school. The Work of this package the construction of approximately 2,121 linear feet of 8-inch waterline, 168 linear feet of 6-inch waterline, and 1,209 linear feet of 8-inch gravity sanitary sewer, including all appurtenances as shown on the contract drawings.
Bidding Closed
11/5/20
OHIO CO. HIGH SCHOOL, AUXILIARY GYM / R.O.T.C. - Download
RBS Design Group
The Work consists of a new freestanding 18,987 SF pre-engineered metal building, with a schedule of November, 2020 to October 1, 2021.
Bidding Closed
8/25/20
Owsley Building Office Remodel 2020 - Download
RBS Design Group
1800 W. 4'" Street, Owensboro, KY
Project includes remodeling of a portion of the office building and the addition of a canopy and sidewalk, reroofing of the existing building.
Bidding Closed
7/21/20
Owensboro Public Schools OHS OMS - Download
RBS Design Group
OWENSBORO, KENTUCKY
OHS PARTIAL RENOVATION & OMS (NORTH CAMPUS) SECURE ENTRY
Bidding Closed
6/9/20
Bus Driver Training Center & BSMS Field House - Download
MACO-Evansville Blue
357 West Arch Street, Madisonville, Ky
Bidding Closed
5/15/20
NEW DAVIESS COUNTY MIDDLE SCHOOL - Download
RBS Design Group
OWENSBORO, KENTUCKY
The Work consists of construction of a new 900-student middle school of approximately 125,075 sq. ft. The design includes three identical ‘pod’ type classroom wings surrounding a secure courtyard and three ICC-500 storm shelters.